Africa Requires Ethiopia Fill Its Dam

crucial facts and observations – please read!

“The GERD, which is 75% finished was entirely funded by the Ethiopian people, is a $5 billion water infrastructure project initiated in 2011. Its purpose is to provide much needed electricity to power Ethiopia’s transition from an agrarian dominated economy to one that encompasses manufacturing and industry. In the years ahead, Ethiopia envisions become a light manufacturing hub for Africa, increasing manufacturing output, and manufacturing jobs by 440%.

The functioning of the GERD is not an option for this emerging nation of 110 million people, but a categorical necessity.

As a physical economist, who has studied Africa for decades, and knows the key drivers of economic growth, I can tell you that nothing is more vital for the survival of Africa, than the production of electricity.  Without abundant and accessible electricity, poverty and disease will not be eliminated. Poverty is the number one enemy of Africa and is the cause of immense suffering for hundreds of millions of Africans.”

re posted from                            AFRICA AND THE WORLD

Africa Requires Ethiopia Fill Its Dam

Lawrence Freeman

July 17, 2020

Ethiopia is entering a crucial period for the future of its nation, as we approach the second half of July. Ethiopia must use the forthcoming rainy season (July to September) to begin the partial filling of its Grand Ethiopian Renaissance Dam (GERD) being built on Ethiopia’s Blue Nile River. When fully completed, the GERD, Africa’s largest hydroelectric project is capable of producing over 6,000 megawatts (MW). This is not only a game changer for Ethiopia, but will contribute to transforming the Horn of Africa.

The Blue Nile, which joins the White Nile just north of Khartoum, Sudan, provides 86% of the water that becomes the Nile River. From there, the Nile flows north through the deserts of Sudan and Egypt before emptying into the Mediterranean Sea.  Ethiopia has been involved in intense discussions with Sudan and Egypt, downstream from the dam, about the amount of water to be withdrawn from the Blue Nile to begin filling the GERD’s 76 billion cubic meter storage/reservoir. Egypt continuously attempts to forestall the filling of the dam, alleging that since it is dependent on the Nile, if the volume of the Nile is reduced, its citizens will suffer irreparable harm. For most of the last century Egypt has received the majority of the Nile River’s 84 billion cubic meters (bcm) of water.

continue reading Here: Source:

Africa Requires Ethiopia Fill Its Dam

 

Leave a Reply